D-Wave Leap — Commercial
Annual subscription, quote-only. Public list prices not republished since 2023 industry reports ($2,000/hr).
1.Representative workload costs
Concrete circuit costs for common workload sizes. Where the pricing model is non-linear (per-program minimums, per-month subscriptions), the table surfaces the floor and break-even points.
Table 1 — Workload cost reference
| Workload | Cost (USD) | Note |
|---|---|---|
| Annual contract | Quote-only | Verify directly with D-Wave sales. Public 2023 figures are stale and should not be used for 2026 budgeting. |
2.Structural hardware advantage
Production access to Advantage2 (4,400+ qubits, Zephyr topology) with priority queue scheduling and hybrid solver allocations. The largest commercial annealer in 2026.
3.Position in the 2026 stack
Production annealer, enterprise contracts only. D-Wave has shifted strategic emphasis from per-hour cloud access toward enterprise consultancy + production-deployment partnerships.
4.Best-fit workloads
- Production combinatorial optimisation workloads (vehicle routing, scheduling, portfolio optimisation)
- Hybrid quantum-classical pipelines that benefit from annealer + classical compute
- Enterprise R&D programmes with multi-year quantum commitments
5.Pricing trap
6.Source
https://www.dwavequantum.com/solutions-and-products/cloud-platform/ · verified 2026-06-03
See also: all providers index · methodology · comparative tables